Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
This phase includes constant monitoring and interaction. We keep an eye on budgets to ensure the lowest costs, stay on top of schedules for timely delivery and work closely with the design team to create your vision.
Working with trusted professionals, we keep them accountable throughout the entire paint. From sequence to production and quality control, we stay focused on the goal.
The last step in any paint. This phase includes site cleanup, final inspections and move-in coordination. After completion, we have a final walkthrough to ensure your complete satisfaction.
1- Clean all areas with a brush and vacuum
2- Mask adjacent surfaces for protection.
3- Repair, spackle and sand all drywall where needed.
4- Fill all nail holes flush to surface.
5- Caulk all open joints on trim with acrylic urethane sealant.
6- Apply two coat desired paint to all walls.
7- Apply two coat desired paint to all ceilings.
8- Apply two coat desired paint to all trims and doors.
1- Clean all exterior surfaces with pressure washer.
2- Scrape / Sand all loose paints.
3- Caulking all cracks and open joints.
4- Oil Prime all bare woods.
5- Masking adjoining surfaces.
6- Apply two coat desired paint to all masonry surfaces.
7- Apply two coat desired paint to all wood surfaces.
1- Un-assemble all cabinet doors and parts.
2- Lightly sand all cabinets and their doors.
3- Clean all sanded surfaces.
4- Fill open joints with wood filler.
5- Oil Prime all cabinets and their doors.
6- Lightly sand all cabinets and their doors.
7- Masking all inside surfaces of the cabinets and their adjoining surfaces.
8- Isolate the kitchen from the rest of the home's areas.
9- Apply two coat desired paint to all cabinets and their doors.
10- Detail check every painted surface.
11- Assemble all cabinet doors and parts.
Copyright © 2021 Expert Painting - All Rights Reserved.